North Florida Rotax Supplemental Regulation
Micro Max
All Micro Max’s will report to Pre-Tech a minimum of ½ hour before Qualifying.
Inspection of the exhaust packing will require that the exhaust core and packing be removed from the pipe.
The packing shall be in good condition with no discernable damage to the packing or burned away material.
The packing shall be the full length of the exhaust core and be tightly wrapped about the exhaust core per Rotax recommendations.
Further the exhaust core shall not have any damage or deformation on the perimeter of the core flange. The core cannot be modified or damaged in any way.
After inspection tech shall provide screws and nuts that shall be wired and sealed by the tech inspector for the duration of the event, the seal may be broken during the weekend but shall be resealed by the tech inspector prior to going on track for competition.